It Started with an Idea, It Grew with Trust

The first step taken in 1978 has evolved into a trusted brand in industrial pump technologies today.
Üstünel journey has been shaped by engineering discipline, continuous improvement, and a commitment to sustainable quality.
Each milestone reflects the goal of delivering more efficient systems and stronger solutions.

ÜSTÜNEL

CORPORATE HISTORY

1978

ESTABLISHMENT

Üstünel entered the industry in 1978 with a commitment to quality manufacturing and engineering principles.

1979

SHAFT PUMP PRODUCTION

Üstünel expanded its product range and technical capabilities by starting shaft pump production in 1979.

1980

SUBMERSIBLE PUMP PRODUCTION

Üstünel strengthened its expertise in water technologies by starting submersible pump production in 1980.

1989

SUBMERSIBLE MOTOR PRODUCTION

Üstünel elevated its system solutions by starting submersible motor production in 1989.

1989

IAOSB 3,000 m² FACILITY

Üstünel increased its production capacity by commissioning its first 3,000 m² facility in IAOSB in 1989.

1994

ESTABLISHMENT OF MOTOR TEST LABORATORY

Üstünel strengthened its testing, quality, and R&D infrastructure by establishing its motor laboratory in 1994.

2000

FIRST EXPORT

Üstünel entered international markets by starting its export activities in 2000.

2001

STAINLESS STEEL SUBMERSIBLE PUMP PRODUCTION

Üstünel increased durability and product diversity by starting stainless steel submersible pump production in 2001.

2005

UTILITY MODEL CERTIFICATE FROM THE TURKISH PATENT INSTITUTE

Üstünel registered its technical designs by obtaining a utility model certificate from the Turkish Patent Institute in 2005.

2006

EXPANSION OF PRODUCTION AREA TO 7,000 M²

Üstünel expanded its production capacity and operational capabilities in 2006 by reaching a 7,000 m² manufacturing facility.

2014

VERTICAL MULTISTAGE PUMP PRODUCTION

In 2014, Üstünel expanded its product range by commencing the production of stainless steel hydrophores.

2017

EXPANSION OF PRODUCTION FACILITY TO 10,000 M²

In 2017, Üstünel significantly increased its production capacity by expanding its manufacturing facility to 10,000 m².

2018

ACCREDITATION OF PUMP TEST LABORATORY BY TÜRKAK

In 2018, Üstünel reinforced its commitment to quality and reliability by obtaining TÜRKAK accreditation for its pump test laboratory.

2019

R&D CENTER REGISTRATION

In 2019, Üstünel strengthened its innovative and technological manufacturing infrastructure by obtaining R&D Center registration

2021

ELECTRIC MOTOR PRODUCTION

In 2021, Üstünel expanded its integrated manufacturing capabilities by commencing the production of electric motors

2023

EXPANSION OF PRODUCTION FACILITY TO 17,000 M²

In 2023, Üstünel elevated its production capacity and operational strength by expanding its manufacturing facility to 17,000 m².

2025

Üstünel GES

The solar power plant investment with an installed capacity of 450 kWp was commissioned in April 2025.

2026

TORBALI 8,000 M² FACILITY

In 2026, Üstünel Pump commissioned its new 8,000 m² factory in Torbalı, enhancing its production and logistics capacity.